This paper, based on a case study on how to deal with a pile-broken accident during concrete-filling hole construction at Beiyuan Metro Station, introduces a workable approach to the pile-broken accident at B21-1 Hole, achieves an planned technological standard which was examined by an authorized unit. This approach, easy but applicable, can provide a reference for similar accidents.