Journals
  Publication Years
  Keywords
Search within results Open Search
Please wait a minute...
For Selected: Toggle Thumbnails
APPLICATION OF DRY-EXCAVATION HOLE IN  UNDERWATER CONCRETE-FILLING BROKEN PILE
YUAN Zhen-guo LIU Ya-chun
Resources & Industries    2008, 10 (1): 108-111.  
Abstract1374)      PDF(pc) (1254KB)(1490)       Save

This paper, based on a case study on how to deal with a pile-broken accident during concrete-filling hole construction at Beiyuan Metro Station, introduces a workable approach to the pile-broken accident at B21-1 Hole, achieves an planned technological standard which was examined by an authorized unit. This approach, easy but applicable, can provide a reference for similar accidents.

Reference | Related Articles | Metrics